Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 16, 2026 at 8:00 PM
Updated September 21, 2026
Site work, paving and renovation of a mixed-use development in Camp Wood, Texas. Working plans call for site work for a playground / park / athletic field; for the renovation of a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.
TPWD plans for the fully constructed park to include but not be limited to: o Park entry and monument signage o Electrical access gate(s) o Paved Roadways including low water crossing(s) o Gravel Roadways o Parkwide directional signage o Operational Facilities to include Park Headquarters, staff residences, park host sites, maintenance yard and supporting buildings o Day Use Facilities to include trailheads, multi-use trails, picnic areas, group pavilion(s), amphitheater, Nature Center, playground, wildlife viewing areas, restrooms, parking areas o Overnight Facilities to include developed and primitive camping areas, mini-cabins, screened shelters, restrooms and associated parking areas o Site utilities including a public water system, wastewater treatment facilities, electrical infrastructure, telecommunications infrastructure, radio tower and associated infrastructure o Sustainable systems o Site demolition o Historic structures renovation / reuse TPWD estimates the Pre-Construction effort for Construction Package 1 (Early Work Package) will begin in February 2027 and conclude in April 2027.
Final Planning
$35,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2026
February 1, 2027
Multiple Locations, Camp Wood, TX
Related To This Project
Camp Wood, TX
Bid Date: Nov 06 2023
Celina, TX
--
Houston, TX
--
Houston, TX
--
Austin, TX
--
Fulshear, TX
--
Denton, TX
--
Fort Worth, TX
--
Todd Mission, TX
--
Garland, TX
--
Houston, TX
--
Sherman, TX
--
Dallas, TX
--
Austin, TX
--
Mineral Wells, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed