BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated July 31, 2026

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a levee.

The Lower Reedy WWRF Streambank Stabilization includes restoration and stabilization of an eroded section of streambank along the Reedy River adjacent to existing sanitary sewer infrastructure. Work includes removal of existing structures and debris, installation of approximately 194 LF of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Disturbed areas and newly constructed slopes will be revegetated to provide final stabilization and reduce the potential for future erosion. Question Deadline 07/23/2026 at 5:00 PM ET

Bid Results

$581,685.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
59
Bidding Soon
1,197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.