BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 27, 2026

Site work and renovation of a bridge / tunnel in Miami, Florida. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

The scope of work includes, but is not limited to, mobilization and demobilization, installation and maintenance of floating turbidity barriers necessary to support the corrective repairs associated with the deficiencies identified in the FDOT Point Inspection Report, repair and adjustment of the elevator wheel assembly, replacement of the center (pivot) bearing, removal and replacement of the manual drive shaft bronze journal , reinforcement of the balance wheel track and support ring affected by corrosion, and removal and replacement of the machinery platform around the center pivot pier. The work shall further include sidewalk joint seal repairs, concrete sidewalk restoration, guardrail and hardware repairs, vegetation and debris removal, final verification and corrective resolution of the deficiencies identified in the FDOT Point Inspection Report, operational testing of the swing bridge, alignment verification , final inspections, and complete closeout documentation including as-built drawings and warranty documents. The Contractor shall coordinate bridge closures and marine traffic, and furnish all labor, materials, and equipment necessary to complete the corrective repairs associated with the deficiencies identified in the FDOT Point Inspection Report, in accordance with applicable City, County, and State requirements. The project includes, but is not limited to, the following tasks : elevator wheel assembly repair; center (pivot) bearing replacement; bronze journal replacement ; balance wheel track reinforcement; machinery platform replacement ; sidewalk joints, guardrail hardware , and concrete restoration; and vegetation and debris removal. Repair of swing bridge including elevator wheel assembly, center pivot bearing replacement, bronze journal replacement, balance wheel track reinforcement, machinery platform replacement, sidewalk joints, guardrail hardware, concrete restoration, and vegetation and debris removal. This project is located at the SW 11th Avenue Swing Bridge - Bridge #865748. The City of Fort Lauderdale, Florida (City) is seeking bids from qualified bidders, hereinafter referred to as the Contractor, to provide construction services for the City's Fort Lauderdale Parks and Recreation Department in accordance with the terms, conditions, and specifications contained in this Invitation to Bid (ITB).

Post-Bid

$5,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
90
Bidding Soon
1,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

October 19, 2026

Project location map

Southwest 11th Avenue, Miami, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.