Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 8, 2026 at 8:00 PM
Updated August 14, 2026
Site work and paving for a municipal facility in Middletown, Ohio. Completed plans call for site work for a municipal facility; and for paving for a municipal facility.
Reconstruction of Atrium Boulevard and the Event Promenade. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond. Questions should be directed to Bill Horst with the Engineering Division at bill.horst@cityofmiddletown.org by 2:00 p.m. on Thursday, July 23, 2026. SCOPE OF WORK Revisions to the Contract Documents (4.1). The City reserves the right to revise the Scope of Work in Contract Documents at any time. Such revisions do not invalidate the Contract or release the Surety, and the Contractor agrees to perform the Work as revised. A. Differing Site Conditions. During the progress of the Work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the Contract Documents or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract Documents, are encountered at the site, the Contractor shall notify the Engineer of the specific differing conditions before they are disturbed or the affected Work is performed. B. Suspension of Work. If the performance of all or any portion of the Work is suspended or delayed by the Engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) for reasons other than those set forth in Section 5 herein and the Contractor believes that additional compensation or time is due as a result of such suspension or delay, notify the Engineer as specified in F.he City will not make an adjustment under this subsection in the event that performance is suspended or delayed by any other cause, of the suspension or delay does not impact the critical path of the schedule, or for which an adjustment is provided or excluded under any other term or condition of this Contract. C. Significant Changes in Character of the Work. The Engineer may alter the Work as necessary to complete the Project. If the alterations or changes in quantities significantly change the character of the Work under the Contract, an adjustment, excluding anticipated profit, will be made to the Contract. D. Eliminated Items. The City may partially or completely eliminate contract items. The City will make an adjustment to compensate the Contractor for the reasonable cost incurred in preparation to perform the eliminated Work prior to the date of the Engineer's written order eliminating the Work. E. Extra Work. Contractor shall perform extra work as directed by the Engineer. The City will pay for extra work as specified in these General Provisions
Award
$3,676,563.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2026
September 28, 2026
Multiple Locations, Middletown, OH
Related To This Project
Middletown, OH
--
Middletown, OH
Bid Date: Jul 30 2026
Middletown, OH
--
Middletown, OH
Bid Date: Aug 12 2026
Middletown, OH
--
Middletown, OH
--
Middletown, OH
--
Middletown, OH
--
Middletown, OH
Bid Date: Jul 10 2026
Middletown, OH
Bid Date: Jun 19 2026
Middletown, OH
--
Middletown, OH
Bid Date: Jun 16 2026
Middletown, OH
Bid Date: May 13 2026
Middletown, OH
Bid Date: Apr 21 2026
Middletown, OH
Bid Date: Apr 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
