Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 26, 2026 at 8:00 PM
Updated August 28, 2026
Site work, paving and outdoor lighting for a civil project in New Milford, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; and water / sewer project.
Scope of work involves reconstruction of the I-81 Exit 219 interchange (Gibson) including relocation of the SB off-ramp (Ramp H), reconstruction and geometry improvement of the remaining existing ramps, shoulder improvement and mill and overlay, SR 848 widening and reconstruction and SR 2081 and T-561 reconstruction. Structure and Geotech scope includes replacement of the SR 848 over SR 0081 bridge (S-37456), replacement of the Ramp G culvert (S-37453), construction of a new Ramp H culvert (S-37454), extension of the existing SR 848 culvert (S-37455), GRS Slope, Soil Nails and Rock Fill slopes. Traffic will be maintained using staged construction including temporary signals at the bridge approaches. Also includes new signing, pavement markings, highway lighting, ITS devices, utility relocations, replacement or upgrade of drainage (including 72” jack and bore across I-81) and barrier protection and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE SR 81, SECTION 590, in SUSQUEHANNA COUNTY, HARFORD AND NEW MILFORD TOWNSHIPS from approximately 0.7 miles south of SR 848 at NB/SB segment 2184/2185 offset 0978/1008 to approximately 0.8 miles north of SR 848 at NB/SB segment 2200/2201 offset 0856/0944. Project Cost Range: $45,000,000.00 - $49,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 26.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-81 Exit 219 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
$50,000,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2026
November 16, 2026
I-81, New Milford, PA
Related To This Project
New Milford, PA
--
New Milford, PA
--
New Milford, PA
Bid Date: Jun 17 2026
New Milford, PA
--
New Milford, PA
Bid Date: Sep 11 2025
New Milford, PA
Bid Date: Sep 01 2025
New Milford, PA
Bid Date: Aug 06 2025
New Milford, PA
Bid Date: Jul 16 2025
New Milford, PA
Bid Date: Jul 14 2025
New Milford, PA
Bid Date: Oct 18 2024
New Milford, PA
Bid Date: Jun 09 2020
New Milford, PA
Bid Date: Aug 28 2024
New Milford, PA
Bid Date: Jun 19 2024
New Milford, PA
Bid Date: May 02 2024
New Milford, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
