Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 1, 2026 at 8:00 PM
Updated September 3, 2026
Renovation of a conference / convention center in Sandy, Utah. Completed plans call for the renovation of a conference / convention center.
Removal and replacement of the large water softener which supplies all domestic water to the facility. Question Deadline 07/29/2026 at 1:00 PM MT Questions shall be submitted through our online solicitation system 1.0 PURPOSE /SCOPE: Salt Lake County Contracts and Procurement, on behalf of the Mountain America Exposition Center, invites your company to bid on the removal and replacement of the large water softener which supplies all domestic water to the facility. Contractor will be responsible for the following: Shutdown and drain building water supply riser. Demo and disposal of existing softener tanks and associated piping and valves. Demo overhead piping near softener and move the 4" soft water bypass up against the wall for softener piping replacement and provide sufficient clearance to remove existing tanks. Provide and install water softener supply manifold and drain lin New brine tank will still have a sock for salt filling. Utilize pre-fab piping so building water is only off for a day. Softener startup and activation Electrical Subcontractor to install 3 GFCI protected outlets for each control valve. Turn water back on to the building and bleed air from fixtures. Specifications: Brand new water softener equipment (new brine tank will still have sock for salt filling)o Freight and service agreement o Softener startup 4" water manifold with 2" branch lines to each of the 3 tanks with a bypass for each tank (Piped per the WCC installation diagram for the Triplex system) 4" manifold to run along the wall and tie into the new bypass installed during the demo phase of the project. Each tank will have isolation valves and unions for service.
Post-Bid
$4,000,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2026
October 5, 2026
9575 S State St, Sandy, UT
Related To This Project
Sandy, UT
Bid Date: Aug 05 2026
Sandy, UT
Bid Date: Aug 04 2026
Sandy, UT
--
Sandy, UT
Bid Date: Aug 05 2026
Sandy, UT
Bid Date: Aug 10 2026
Sandy, UT
--
Sandy, UT
Bid Date: Aug 25 2026
Sandy, UT
Bid Date: Aug 25 2026
Sandy, UT
Bid Date: Jul 27 2026
Sandy, UT
Bid Date: Jul 17 2026
Sandy, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
