Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and renovation of a development in Prairie du Chien, Wisconsin. Completed plans call for the renovation of a development; and for site work for a development.

Clearing and grubbing, grading, riprap installation, and landscaping along Mill Coulee Creek. Bonds: 5% Bid Bond, Certified Check required. Question Deadline 07/27/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. B. Written inquiries shall be mailed or hand delivered to Jordan Fure, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. Electronic inquiries shall be emailed to the following email address: furej@delta3eng.biz with the subject line "Proposed 2026 Stream ImproImprovements - Mill Coulee Creek". Work of each separate Contract is identified in the following and on Drawings: Contract #1 - Stream Improvement Construction: Location: Mill Coulee Creek. See Plans for location details. Description of Work to be completed: Stream bank stabilization as provided in the Plans. Work includes: Installation and maintenance of traffic control devices and measures. Installation and maintenance of erosion control measures. Clearing and grubbing. a) Contractor shall be responsible for a burn permit (if applicable). Excavation/Fill for grading and rip-rap. a) Contractor to coordinate fill site with landowner. b) Excavated material shall not be deposited within wetlands or floodplain. 5) Installation of heavy rip-rap over geotextile fabric. 6) Installation of in-stream habitat structures 7) Installation of swamp white oak trees Landscaping and restoration. Complete landscaping and restoration as streambanks are stabilized Complete temporary seeding for any disturbed areas that are to remain idle greater than 7 days. The necessary machinery, equipment, tools, materials, labor, and all construction means and methods to complete installation of the Stream Improvements in place and ready for use. Alternate 'A' - Culvert Replacement including: Stream bypass, dewatering, and sediment control. Removal of existing Culverts (3 Each). (1) 5' x 5' concrete box culvert (1 Each). (2) 48" CMP culvert (2 Each). Installation of 171" x 110" Corrugated Steel Arch Pipe. Installation of Heavy Rip-Rap over Geotextile Fabric. Replacement and regrading of gravel driveway. Award is subject to final approval.

Award

$141,500.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
38
Bidding Soon
673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

September 28, 2026

Project location map

Multiple Locations, Prairie du Chien, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed