Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 13, 2026 at 8:00 PM
Updated August 16, 2026
Paving for a municipal facility in Fort Myers, Florida. Completed plans call for paving for a municipal facility.
Asphalt roadway resurfacing including milling and replacing asphalt, paving, and full depth reclamation at various street locations. Question Deadline 08/06/2026 at 2:00 PM ET submit questions through Online. Direct inquiries to the following: Procurement Representative Name Cathy Scott, Senior Procurement Specialist 2200 Second Street Fort Myers, FL 33901 Email : cscott@fortmyers.gov Phone: (239) 321-7235 The work is divided into the following sections: Package 1 - Mill and Replace Asphalt Resurfacing Package 2 - Mill and Replace Asphalt Paving Alternate Bid - Full Depth Reclamation Method Package 1 Mill and Replace Asphalt Resurfacing 2.1. Description of Work Package 1 consists of conventional mill and replace asphalt resurfacing operations at the street locations listed below. The streets identified under Package 1 shall be completed as one package. 2.2. Street Locations Package 1 shall include work on the following streets: Shadow Ln - Llewellyn Dr - Virginia Ave -Canal St Sommerset Dr Van Buren St O Madison Ave - Rio Vista O Burtwood Dr - Challenger Blvd - 2.3. Scope of Work - Package 1 The Contractor shall furnish all labor, materials, equipment, supervision, transportation, maintenance of traffic, coordination, cleanup, and incidentals necessary to complete the Package 1 asphalt roadway resurfacing improvements. The work for Package 1 shall include, but is not limited to: - Asphalt milling of existing pavement surfaces -Preparation of milled and existing roadway surfaces - Roadway surface preparation - Application of tack coat -Placement and compaction of asphalt pavement - Grading and compaction, as needed - Adjustment of utility structures as needed -Restoration of pavement markings disturbed or removed by the work - Traffic control and maintenance of traffic - Permitting as may be required O Cleanup and removal of debris associated with the work - Restoration of areas disturbed by the Contractor's operations - All associated work necessary to provide complete and functional roadway resurfacing improvements All quantities shall be as represented in the Schedule of Bid Items. 3. Package 2 - Mill and Replace Asphalt Paving 3.1. Description of Work Package 2 consists of conventional mill and replace asphalt paving operations at the street locations listed below. The streets identified under Package 2 shall be completed as one package. 3.2. Street Locations Package 2 shall include work on the following streets: - Jaylen Watkins St Towles St - Barden St - Quality of Life Center Way Carver Ave French St 3.3. Scope of Work - Package 2 The Contractor shall furnish all labor, materials, equipment, supervision, transportation, maintenance of traffic, coordination, cleanup, and incidentals necessary to complete the Package 2 asphalt roadway resurfacing improvements. The work for Package 2 shall include, but is not limited to: - Asphalt milling of existing pavement surfaces - Preparation of milled and existing roadway surfaces - Roadway surface preparation - Application of tack coat Placement and compaction of asphalt pavement - Grading and compaction, as needed -Adjustment of utility structures as needed -Restoration of pavement markings disturbed or removed by the work - Traffic control and maintenance of traffic Permitting as may be required O Cleanup and removal of debris associated with the work -Restoration of areas disturbed by the Contractor's operations - All associated work necessary to provide complete and functional roadway resurfacing improvements All quantities shall be as represented in the Schedule of Bid Items
Sub-Bidding
$2,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 17, 2026
October 16, 2026
Multiple Locations, Fort Myers, FL
Related To This Project
Fort Myers, FL
Bid Date: Aug 18 2026
Fort Myers, FL
Bid Date: Aug 20 2026
Fort Myers, FL
Bid Date: Jul 27 2026
Fort Myers, FL
Bid Date: Aug 24 2026
Fort Myers, FL
Bid Date: Aug 25 2026
Fort Myers, FL
Bid Date: Aug 04 2026
Fort Myers, FL
Bid Date: Aug 18 2026
Fort Myers, FL
Bid Date: Aug 19 2026
Fort Myers, FL
Bid Date: Jul 30 2026
Fort Myers, FL
Bid Date: Aug 28 2026
Fort Myers, FL
Bid Date: Aug 03 2026
Fort Myers, FL
Bid Date: Aug 12 2026
Fort Myers, FL
Bid Date: Aug 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
