BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2026 at 8:00 PM

Updated August 17, 2026

Site work, paving, renovation and addition to a mixed-use development in Dodgeville, Wisconsin. Completed plans call for the renovation of a municipal facility; for paving for a municipal facility; for site work for a municipal facility; for the addition of a municipal facility; road / highway; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Reconstruction of parking lot and roadway including drop-off lane, curb and gutter, HMA pavement, storm sewer, piping, and off-street grading. Bonds: 5% Bid Bond. Please contact us at 608-524-6468 if you have any questions. Addition of a drop off lane at the front entrance of City Hall, removal and replacement of concrete curb and gutter, HMA pavement, storm sewer downspout connection and piping, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B: Reconstruction of Bea Ann Drive adjacent to E Leffler St (250LF) including reconstruction of street, curb and gutter, and storm sewer, off street grading to improve erosion of drainage way between Bea Ann Drive and Lisa St, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents.

Award

$191,300.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
66
Bidding Soon
1,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

September 28, 2026

Project location map

100 E Fountain St, Dodgeville, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.