BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 27, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in East Providence, Rhode Island. Completed plans call for paving for a bridge / tunnel; for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Washington bridge replacement. Construction of a new bridge replacing the existing Washington Bridge North that carries I-195 Westbound. Walsh Construction, released a timeline of the milestones they expect to hit between now and November 2028, when the newly rebuilt bridge is scheduled to reopen. Rocchio said the rebuild is well underway. Project timeline below. Summer 2026: Work on west trestle is completed as shafts are drilled for west abutment and piers 1-4. Fall 2026: Prep for remaining substructures continues as construction starts on west abutment and piers 1 and 2. Foundation installation continues for remaining piers and abutments. Winter 2026-27: Prep is completed and pier construction continues. Micropile installation begins and first steel beams are put in place. Spring 2027: Work begins on arch footings and more steel spans are installed. Construction is completed for remaining piers and east abutment. Summer 2027: Abutment construction and steel erection for main bridge are completed. Installation of Gano Street off-ramp begins, along with retaining wall construction and in-fill on eastern side. Fall 2027: Main bridge deck is poured and Gano Street underpass reopens. Winter 2027-28: Work continues on new Gano Street on-ramp. Spring 2028: Gano Street off-ramp deck is poured and Gano Street on-ramp reopens to traffic, while remaining deck work is completed on the new bridge. Summer 2028: Bridge barriers, lighting and overhead signs are installed. Fall 2028: The westbound side of the bridge reopens to traffic. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

$4,058,800,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
807
Active Projects
337
Bidding Soon
5,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

I-195, East Providence, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.