BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 24, 2026

Renovation of an educational facility in Plaquemine, Louisiana. Completed plans call for the renovation of a educational facility.

Boiler replacement at Crescent Elementary School. SCOPE OF WORK The Contractor shall obtain the services of an independent Test and Balance (TAB) Company which specializes in the testing and balancing of heating, ventilating and air conditioning (HVAC) systems to test, adjust and balance all HVAC systems in the building(s). The work included in this section consists of furnishing labor, instruments, and tools required in testing, adjusting and balancing the HVAC systems as described in these specifications or shown on accompanying drawings. Services shall include checking equipment performance, taking the specified measurements, and recording and reporting the results. The testing, adjusting and balancing agency shall act as a reporting agency; that is, list and report each piece of equipment as to identification number, manufacturer, model number, serial number, proper location, specified performance, and report actual performance of all equipment as found during testing. The report is intended to be used during the life of the building as a ready reference indicating original conditions, equipment components, etc. Representatives of the Test and Balance Company shall visit the job site during installation of the HVAC equipment, piping and ductwork as required. Upon completion of the HVAC system installation , the Test and Balance Company shall perform all required testing and balancing with the full cooperation of the Contractor and his Sub-contractors. The Contractor shall make changes and/or adjustments to the HVAC system components that are required by the Test and Balance Company to accomplish proper balancing. The TAB agency shall not supply or install any materials or balancing devices such as pulleys, drives, belts, etc. All of this work is by the Contractor and shall be performed at no additional cost to the Owner.The test and balance report complete with a summary page listing all deficiencies shall be submitted to the Engineer for review by his Mechanical Engineer. If the Mechanical Engineer agrees with the report, he shall sign it and return it to the Engineer. The test and balance report must be complete and must be accepted by the Mechanical Engineer prior to acceptance of the project. Any outstanding test and balance items shall be placed on the punch list and a monetary value shall be assigned to them. After all deficiencies have been corrected the Mechanical Engineer shall sign the testing and balancing report, and the Test and Balance Company shall supply four (4) copies of the final and complete report to the Engineer for inclusion in the Operation and Maintenance Manuals. The items requiring testing, adjusting, and balancing include (but are not restricted to) thefollowing: HYDRONIC SYSTEMS: Pumps System Mains and Branches Heat Exchangers Coils Control Valves No oral interpretations will be made to Bidders as to the meaning of Bidding Documents. Bidders and sub-Bidders requests for such interpretations shall be made in writing to the Architect no later than seven (7) working days prior to date and time for receiving bids and failure on the part of the successful Bidder to do so shall not relieve him, as a contractor, of the obligation to execute such work in accordance with a later interpretation by the Architect Question Deadline 07/31/2026

Sub-Bidding

$200,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
25
Bidding Soon
1,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2026

September 9, 2026

Project location map

62575 Bayou Rd, Plaquemine, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.