BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 13, 2026

Demolition, site work, paving and new construction of a mixed-use development in Marietta, Georgia. Completed plans call for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Collins Road over Little Allatoona Creek This is a bridge replacement project involving replacement of existing bridge on Collins Road over Little Allatoona Creek with temporary detour construction, curb and gutter, sidewalk installation, and water system work. May require Georgia Utility Contractor License and GDOT bid requirements compliance. Project consists of replacement of existing bridge on Collins Road at Little Allatoona Creek. A temporary on site detour north of the existing bridge will be required. Project also includes curb and gutter and a five-foot wide sidewalk on the south side of the bridge. The total project length is 0.13 miles. Cobb County Water System work will also be included. The time allowed for performance of the project will be 300 from the Notice to Proceed. Liquidated damages of $2,000.00 per consecutive calendar day shall be assessed for failure to complete the project within the specified time frames. All bids shall be accompanied by an Electronic Bid Bond via Bid Express a Paper Bid Bond, or a Certified Check delivered in a sealed envelope, indicating the project name and project number, to Cobb County Procurement Services Department, 1828 West Oak Parkway, Marietta, Georgia 30062, BEFORE THE 12:00 NOON DEADLINE. Bid Bond shall be drawn in favor of the Board of Commissioners, Cobb County, Georgia, in the amount of five percent (5%) of the bid for the complete work. Question Deadline 08/07/2026 at 2:00 PM ET Any questions must be received by Cobb County Procurement Services Department the Friday prior to the bid opening. All questions should be sent via email to ProcurementServices@cobbcounty.org. The Cobb County Board of Commissioners reserves the right to reject all bids and to waive formalities. Any claims for cost incurred by any Bidder in preparation of any part of or total package for this project will not be considered for reimbursement by Cobb County.

GC Bidding

$4,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
142
Bidding Soon
2,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

October 12, 2026

Project location map

Collins Rd, Marietta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.