BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 17, 2026

Demolition, site work, new construction and renovation of a medical facility in Salinas, California. Completed plans call for the demolition of a medical facility; for the renovation of a medical facility; for the construction of a medical facility; and for site work for a medical facility.

The Work consists of the following three capital improvement projects, which are being solicited under a single competitive procurement and will be awarded to a single bidder and executed under three separate construction contracts for District accounting purposes: (A) SVM CIP Chiller Replacement 200T - replacement of an existing 200-ton centrifugal chiller, cooling tower, and associated mechanical, electrical, and controls systems. (B) SVM CIP LAB AIR HANDLER - replacement of an existing air handling unit and associated distribution system components primarily serving the laboratory and other critical care areas. (C) THERMAL FLUID PLANT - replacement of existing boilers and thermal fluid heaters with new high-efficiency boiler equipment, associated mechanical, electrical, and control systems; connections to existing heating water, fuel, flue, condensate, and power systems; and construction of a structural bridge to support associated piping. Bonds: Bid Bond required (unspecified amount), 100% Performance Bond, 100% Payment Bond. Question Deadline 08/07/2026- All written requests for interpretation (RFIs) or correction of the Contract Documents must be received within five (5) days of close of bid. Send all pre-bid questions and requests for interpretation to SVH via email at: kdo@bogardconstruction.com.

Post-Bid

$20,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
100
Bidding Soon
1,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 26, 2026

Project location map

450 E Romie Ln, Salinas, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.