BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated August 2, 2026

Site work and new construction of a municipal facility in Lindon, Utah. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Construction of a new District Office facility to serve as central administrative headquarters. Questions Due Date: Jul 28th 2026, 2:00 PM MDT The CM /GC must be capable of and willing to work closely with Timpanogos School District representatives and the selected architect, through the design phase, providing cost estimates, schedules, and feedback on design details, phasing, and availability of materials selected. The new building will be approximately 22,000 square feet on an undeveloped portion (approximately 1 acre) of an existing district site located in Lindon, Utah. Construction is projected to start in October 2026, and the project is to be completed in June 2027. The Fixed Limit of Construction Cost (FLCC) for the CM /GC is 8,000,000. CM/GC WORK PHASES The CM /CG work for the project consists of two (2) phases: pre-construction and construction . Pre-construction Phase: This phase of the work includes, but is not limited to, attending design meetings, estimating and cost control, schedule development, and drawing/constructability reviews. The construction manager shall provide a full construction estimate prior to bidding the project to subcontractors. The construction manager shall monitor the bid climate, make recommendations to the design team for the most advantageous bidding time, and then solicit bids from subcontractors. Construction Phase : This phase of the work consists of the contractor furnishing and installing all work as required in the contract documents. Please note that Work of the Construction Phase may be bid in several packages, such as excavation , footings, foundations, structural steel, etc. FLCC AND GMP A. FLCC: The Fixed Limit of Construction Cost, or FLCC, is the project's construction budget as listed in the Notice to Contractors and this RFP's Description of Work section. The Owner, the design team, and the CM/GC Contractor agree to work together to keep the cost of construction, as represented in the design, within the FLCC Question Deadline 07/28/2026 at 2:00 PM MT The question and answer period close on the date and time specified on U3P

Post-Bid

$8,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
78
Bidding Soon
1,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

October 1, 2026

Project location map

To be Determined, Lindon, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.