Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 22, 2026 at 8:00 PM
Updated August 2, 2026
Site work and new construction of a municipal facility in Lindon, Utah. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
Construction of a new District Office facility to serve as central administrative headquarters. Questions Due Date: Jul 28th 2026, 2:00 PM MDT The CM /GC must be capable of and willing to work closely with Timpanogos School District representatives and the selected architect, through the design phase, providing cost estimates, schedules, and feedback on design details, phasing, and availability of materials selected. The new building will be approximately 22,000 square feet on an undeveloped portion (approximately 1 acre) of an existing district site located in Lindon, Utah. Construction is projected to start in October 2026, and the project is to be completed in June 2027. The Fixed Limit of Construction Cost (FLCC) for the CM /GC is 8,000,000. CM/GC WORK PHASES The CM /CG work for the project consists of two (2) phases: pre-construction and construction . Pre-construction Phase: This phase of the work includes, but is not limited to, attending design meetings, estimating and cost control, schedule development, and drawing/constructability reviews. The construction manager shall provide a full construction estimate prior to bidding the project to subcontractors. The construction manager shall monitor the bid climate, make recommendations to the design team for the most advantageous bidding time, and then solicit bids from subcontractors. Construction Phase : This phase of the work consists of the contractor furnishing and installing all work as required in the contract documents. Please note that Work of the Construction Phase may be bid in several packages, such as excavation , footings, foundations, structural steel, etc. FLCC AND GMP A. FLCC: The Fixed Limit of Construction Cost, or FLCC, is the project's construction budget as listed in the Notice to Contractors and this RFP's Description of Work section. The Owner, the design team, and the CM/GC Contractor agree to work together to keep the cost of construction, as represented in the design, within the FLCC Question Deadline 07/28/2026 at 2:00 PM MT The question and answer period close on the date and time specified on U3P
Post-Bid
$8,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2026
October 1, 2026
To be Determined, Lindon, UT
Related To This Project
Lindon, UT
Bid Date: Jul 21 2026
Lindon, UT
Bid Date: Jun 24 2026
Lindon, UT
--
Lindon, UT
Bid Date: May 19 2026
Lindon, UT
Bid Date: Dec 18 2025
Lindon, UT
Bid Date: Nov 05 2025
Lindon, UT
Bid Date: Nov 05 2025
Lindon, UT
--
Lindon, UT
Bid Date: Jul 07 2025
Lindon, UT
Bid Date: May 30 2025
Lindon, UT
--
Lindon, UT
Bid Date: Mar 13 2025
Lindon, UT
Bid Date: Oct 15 2024
Lindon, UT
Bid Date: Aug 22 2024
Lindon, UT
Bid Date: Aug 22 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
