BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 19, 2026

Renovation of a military facility in Middle River, Maryland. Completed plans call for the renovation of a military facility.

Services for two non-compliant door assemblies located at two separate Sensitive Compartmented Information Facilities (SCIFs). The existing door assemblies do not meet current security standards for acoustic and radio frequency (RF) shielding as required by Intelligence Community Directive/Intelligence Community Standard (ICD/ICS) 705. The project includes upgrading or replacing the door assemblies to achieve full compliance with Sound Transmission Class (STC) and RF shielding requirements, ensuring both facility entrances meet current security standards. Questions are due by [August 05, 2026 at 11:00 AM ET]. The question deadline is set here in the solicitation, not by SAM.gov. Send all questions by email to the contracting office. Do not contact the engineering or design staff directly, because that only delays the answer. Use this format so answers can be posted quickly: To: [175WG.MSC.Org@us.af.mil] 175th Wing, Maryland Air National Guard (MDANG), Martin State Airport, Middle River, Maryland 21220

Post-Bid

$3,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
848
Active Projects
359
Bidding Soon
5,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 11, 2026

Project location map

Multiple Locations, Middle River, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.