BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 25, 2026

Site work and renovation of a fire / police facility in Palos Park, Illinois. Completed plans call for the renovation of a 2,353-square-foot fire / police facility; and for site work for a fire / police facility.

Re-Epoxying Apparatus Bay Floor Questions may be directed to Fire Chief Michael Gabriele at paloschief@palosfire.org or at 708-448-0369 x.7. Installation of an epoxy flooring system including surface preparation, mechanical grinding, crack and joint repair, application of epoxy primer, base coat, and topcoat with slip-resistant additives. Palos Fire Protection District is seeking proposals from qualified contractors to provide labor, materials, and equipment necessary to install an epoxy flooring system at the facility located at: Project Location: 8815 W. 123rd St. Palos Park, IL 60464 The intent of this project is to install a durable, slip-resistant, high-performance epoxy flooring system designed for heavy traffic, chemical resistance, and long-term durability. 2. Project Scope of Work The contractor shall provide all labor, materials, tools, equipment, and supervision required to complete the epoxy flooring installation, including, but not limited to: Surface Preparation o o o Mechanical grinding or shot blasting of existing concrete surface Removal of contaminants , coatings, grease, or debris Crack and joint repair where necessary Moisture testing of concrete substrate Epoxy Flooring Installation Application of epoxy primer Application of base coat Optional broadcast of aggregate or decorative flakes (if specified) Application of topcoat or clear protective coat Installation of slip-resistant additives where required 3. Performance Requirements The installed flooring system must: Be resistant to chemicals , oil, and fuel Provide slip resistance for safety Be easy to clean and maintain Meet manufacturer specifications for thickness and curing time 4. Project Area Approximate flooring area: Total Square Footage: Areas Included: Existing Surface: Epoxy Engine/Ambulance Bay- 2,210 sqft Two Hallways- 143 sqft 0 Total 2,353 sqft Contractor is responsible for verifying all field dimensions.

GC Bidding

$800,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
146
Bidding Soon
4,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2026

September 14, 2026

Project location map

8815 123rd St, Palos Park, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.