Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 22, 2026 at 8:00 PM
Updated July 28, 2026
Renovation of a mixed-use development in Fort Liard, Northwest Territories. Completed plans call for the renovation of a municipal facility; educational facility; and medical facility.
The GNWT is seeking a proposal for design and construction services to upgrade three assets in Fort Liard. The summary of the upgrade requirements is as follows: A) Environment and Natural Resources (ENR). The building is a single-storey structure with a main floor that consists of four enclosed offices, an administrative office area, and two washrooms. The exterior 2x6 walls of the subject building are finished with vertically oriented dimensional lumber painted brown, atop plywood, and are insulated with fiberglass throughout. The work on this building includes removing the existing windows, exterior doors, and wooden siding, and replacing them with new exterior doors, windows, and metal siding, B) Fort Liard Health Centre (GNWT Asset 000770) is a stick-built two-storey rectangular structure with a health clinic on the main floor and three (3) residential suites (apartments) on the second floor. The exterior 2x6 walls of the subject building are finished with raised seam sheet metal atop plywood and a vapor barrier, and are insulated with fiberglass batts. The existing envelope (excluding roofing) will be removed and replaced with new metal siding, windows, and doors. The entrance ramp will be demolished, properly disposed of, and replaced with a new barrier-free (BF) ramp. C) Echo Dene School building (circa 1987) is a stick-built one-story education complex with a concrete half-basement boiler/mechanical room below the gymnasium and a raised metal/concrete pile foundation with crawlspace. The exterior 2x6 walls of the subject building are finished with a corrugated (lower) and raised seam (upper) metal sheet siding atop plywood and insulated with fiberglass insulation throughout. The work on the Echo Dene School building is limited to replacing the four existing doors with new units. All upgrading work on the three assets shall comply with the National Building Code of Canada and meet the minimum standards set out in "Good Building Practices for Northern Facilities". Question Deadline 08/07/2026 All questions or enquiries directed to the following Attention: Address: Contracts Administrator Government of the Northwest Territories Department of Finance Procurement Shared Services Phone: (867) 446-6148 Facsimile: (867) 920-4112 E-mail: psstendershayriver@gov.nt.ca
GC Bidding
$1,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
October 1, 2026
Multiple Locations, Fort Liard, NT
Related To This Project
Fort Liard, NT
--
Fort Liard, NT
Bid Date: Jan 29 2024
Fort Liard, NT
Bid Date: Feb 24 2023
Inuvik, NT
Bid Date: Aug 13 2026
Fort Simpson, NT
--
Yellowknife, NT
--
Yellowknife, NT
Bid Date: Jul 31 2026
Yellowknife, NT
--
Yellowknife, NT
--
Yellowknife, NT
Bid Date: Jul 28 2026
Hay River, NT
Bid Date: Jul 24 2026
Fort Resolution, NT
Bid Date: Jul 14 2026
Hay River, NT
Bid Date: Jul 22 2026
Hay River, NT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
