Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 21, 2026 at 8:00 PM
Updated July 25, 2026
This is a service / maintenance or supply contract in Peosta, Iowa. Contact the soliciting agency for additional information.
Tree Planting Site Preparation, Tree Planting, and Herbicide Application Project Dates : Aug 14th, 2026 - June 30th, 2027 Subrecipient shall hire a contractor to complete the following in Stands 1,2, and 3 from the accompanying Forest Project Plan for the Strathman/Heritage Trail Addition property in Dubuque County. Contractor shall prepare the area for tree planting by mowing the full area in August/September. Contractor shall apply glyphosate in rows at 10' apart on center to the mowed area once grasses have grown to around 4-6" in height following mowing. Chemicals used in performing these practices shall be applied according to authorized use, labeled direction, and other federal or state policies and requirements. Applicator shall hold an Iowa Commercial Pesticide Applicators License issued by the Iowa Department of Agriculture and Land Stewardship (IDALS) Pesticide Bureau and provide license # to the DNR Project Manager unless a non-restricted herbicide is being used, and has been approved by the DNR Project Manager. Contractor must plant Field 1 with 2500 seedlings using a spacing of 10' between rows and 6' between seedlings within rows. Contractor must plant Field 2 with 1400 seedlings using a spacing of 10' between rows and 6' between seedlings within rows. Contractor must plant Field 3 with 9700 seedlings using a spacing of 10' between rows and 6' between seedlings within rows. Seedlings must be 3-0 age class, if available. If unavailable, the next largest size class must be used. Follow the species list and quantity in the accompanying plan. Substitutions must be preapproved by the DNR District Forester. Contractor must plant the seedlings within one week of their arrival. If seedlings cannot be planted within one week of their arrival, the contractor must keep them in cold storage at 35-40 degrees Fahrenheit. All seedlings must be planted at the same depth as they were grown in the nursery or slightly below with no exposed roots. Seedlings must be properly tamped in to eliminate air pockets and should not pull out with a slight tug. Seedlings must be vertically planted and do not lean by an angle more than 20 degrees. For best success of the trees, it is recommended to install 400 five-foot-tall, vented tree tubes (ex. TreePro brand) and fiberglass stakes in Field 1, 200 tubes and stakes in Field 2, and 1000 tubes and stakes in Field 3. Stakes could include commercially available stakes (ex: Plantra brand) or fiberglass rebar. These should be installed on a mix of oak species. After all the seedlings are planted and before any vegetation emerges, Contractor must spray a 4-foot-wide band down each row and directly over top of seedlings with Pendulum and Princep herbicides. Contractor must apply 2 quarts per acre of Pendulum. Contractor must apply 3 quarts per acre of Princep. Chemicals used in performing these practices shall be applied according to authorized use, labeled direction, and other federal or state policies and requirements.
Sub-Bidding
Public - County
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2026
August 14, 2026
Multiple Locations, Peosta, IA
Related To This Project
Peosta, IA
Bid Date: Aug 13 2026
Peosta, IA
Bid Date: Aug 13 2026
Peosta, IA
Bid Date: Aug 11 2026
Peosta, IA
Bid Date: Apr 23 2026
Peosta, IA
Bid Date: Apr 21 2026
Peosta, IA
Bid Date: Feb 13 2026
Peosta, IA
Bid Date: Mar 17 2026
Peosta, IA
Bid Date: Nov 04 2025
Peosta, IA
Bid Date: Oct 21 2025
Peosta, IA
Bid Date: Apr 15 2025
Peosta, IA
Bid Date: Apr 01 2025
Peosta, IA
Bid Date: Jan 22 2025
Peosta, IA
Bid Date: Nov 19 2024
Peosta, IA
Bid Date: Nov 13 2024
Peosta, IA
Bid Date: Jul 21 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.