BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 27, 2026

Renovation of a detention facility in Allenwood, Pennsylvania. Conceptual plans call for the renovation of a detention facility.

Provide all labor, materials, equipment, engineering services, supervision, and qualified personnel necessary to design, demolish, replace, install, test, start up, and commission HVAC systems at FCC Allenwood. Work includes preparation and submission of a complete 100% design package for approval, demolition and proper disposal of one existing 30-ton package HVAC unit and one existing 50-ton package HVAC unit, including indoor air handling units, outdoor condensers, and return fans, along with disconnecting, locking out, and reconnecting associated electrical systems. Existing ductwork shall remain in place. Install one new 30-ton HVAC unit and one new 50-ton HVAC unit of similar make, model, and capacity to the units being removed, including outdoor condensers, indoor air handlers, and return fans. New equipment shall be installed on existing concrete pads with properly sized isolators; any required pad extensions shall be provided. Work includes final duct connections using flexible duct connections, installation of new condensate drain piping to approved drains, new outdoor or indoor disconnects as required, and new copper refrigerant line sets. Refrigerant piping shall be pressure tested at 300 PSI for 24 hours and triple evacuated to 500 microns. Provide and install new variable frequency drives (VFDs), duct smoke detectors, smoke dampers, economizer dampers, and all required control devices. Integrate all controls with the existing Automated Logic control system. Perform all ductwork construction, installation, and pressure or leakage testing in accordance with the latest SMACNA standards. Open and restore walls, ceilings, or other building components as necessary to access existing systems and infrastructure. Complete equipment startup, testing, and air balancing of the new HVAC systems. Provide training to facility staff on system operation, maintenance, and troubleshooting. Furnish a minimum five-year warranty covering labor and materials, along with all applicable manufacturer warranties, beginning at substantial completion. Location: Federal Correctional Complex Allenwood, Route 15, 2 Miles North of Allenwood, Allenwood, PA 17810. The estimated magnitude of this project lies between $1,000,000 and $5,000,000.The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$5,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
88
Bidding Soon
2,466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2027

Project location map

To Be Determined, Allenwood, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.