BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 31, 2026 at 8:00 PM

Updated September 3, 2026

Demolition, site work, paving, new construction and renovation of a mixed-use development in Fullerton, California. Completed plans call for the renovation of a playground / park / athletic field; and one-story above grade playground / park / athletic field.

The Project consists of renovation of the existing softball field at Fullerton College, 321 E. Chapman Ave, Fullerton, CA 92832. Work includes: 1. Selective Site Demolition Work Consisting of: a. Partial removal of existing asphalt and concrete paving. b. Removal of existing site improvements, including, but not necessarily limited to: - Perimeter fencing and gates. - Outfield walls. - Softball and Baseball foul poles. - Scoreboards (2). - 30 foot high perimeter field netting. - Bleachers, including footings. - One of 2 batting cages. Other to remain. - Existing portable toilets: Return to District or as directed. - Partial removal of existing irrigation system. 2. Selective Building Demolition Work Consisting of: a. Removal of two existing dugout structures and one storage shed. 3. New Construction Consisting of: a. Home Team Building to include: - Cast-in-place concrete slab and footings. - Concrete masonry walls. - Men's and Women's toilet rooms. - Team Room and Coach's Office. - Single Ply Polyvinyl Chloride (PVC) Roofing over insulation. b. Visitor's Dugout: - Structural steel and metal deck. - Single Ply Polyvinyl Chloride (PVC) Roof on metal deck c. Home bleachers with Press Box. 4. Site Improvement Work Consisting of: a. Hardscape and landscaping surrounding new building, including, but not necessarily limited to: - New underground utilities serving building. - Asphalt and concrete paving for parking areas and walkways. Includes sealing and restriping of pavement markings. - New landscaping, including: (a) Expanding and regrading of Softball Field; (b) Warning track; (c) Soil preparation; (d) Plant materials, including sodded turf for outfield; (e) Synthetic turf at batting cages. - Irrigation systems, including controllers, booster pumps, and associated piping and fittings. - Renovation of existing baseball field. b. 50 foot high netting. c. Perimeter fencing. d. 8 foot high concrete masonry outfield walls. e. Scoreboards and supporting structure. f. New batting cages and relocation of existing batting cages. Online Q&A Yes Q&A Deadline 08/03/2026 5:00 PM (PDT)

GC Bidding

$7,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
214
Bidding Soon
3,994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

October 1, 2026

Project location map

321 E Chapman Ave, Fullerton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.