Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 31, 2026 at 8:00 PM
Updated September 3, 2026
Demolition, site work, paving, new construction and renovation of a mixed-use development in Fullerton, California. Completed plans call for the renovation of a playground / park / athletic field; and one-story above grade playground / park / athletic field.
The Project consists of renovation of the existing softball field at Fullerton College, 321 E. Chapman Ave, Fullerton, CA 92832. Work includes: 1. Selective Site Demolition Work Consisting of: a. Partial removal of existing asphalt and concrete paving. b. Removal of existing site improvements, including, but not necessarily limited to: - Perimeter fencing and gates. - Outfield walls. - Softball and Baseball foul poles. - Scoreboards (2). - 30 foot high perimeter field netting. - Bleachers, including footings. - One of 2 batting cages. Other to remain. - Existing portable toilets: Return to District or as directed. - Partial removal of existing irrigation system. 2. Selective Building Demolition Work Consisting of: a. Removal of two existing dugout structures and one storage shed. 3. New Construction Consisting of: a. Home Team Building to include: - Cast-in-place concrete slab and footings. - Concrete masonry walls. - Men's and Women's toilet rooms. - Team Room and Coach's Office. - Single Ply Polyvinyl Chloride (PVC) Roofing over insulation. b. Visitor's Dugout: - Structural steel and metal deck. - Single Ply Polyvinyl Chloride (PVC) Roof on metal deck c. Home bleachers with Press Box. 4. Site Improvement Work Consisting of: a. Hardscape and landscaping surrounding new building, including, but not necessarily limited to: - New underground utilities serving building. - Asphalt and concrete paving for parking areas and walkways. Includes sealing and restriping of pavement markings. - New landscaping, including: (a) Expanding and regrading of Softball Field; (b) Warning track; (c) Soil preparation; (d) Plant materials, including sodded turf for outfield; (e) Synthetic turf at batting cages. - Irrigation systems, including controllers, booster pumps, and associated piping and fittings. - Renovation of existing baseball field. b. 50 foot high netting. c. Perimeter fencing. d. 8 foot high concrete masonry outfield walls. e. Scoreboards and supporting structure. f. New batting cages and relocation of existing batting cages. Online Q&A Yes Q&A Deadline 08/03/2026 5:00 PM (PDT)
GC Bidding
$7,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2026
October 1, 2026
321 E Chapman Ave, Fullerton, CA
Related To This Project
Fullerton, CA
Bid Date: Apr 16 2027
Fullerton, CA
Bid Date: Aug 13 2026
Fullerton, CA
--
Fullerton, CA
--
Fullerton, CA
Bid Date: Aug 18 2026
Fullerton, CA
Bid Date: Jul 02 2026
Fullerton, CA
Bid Date: Jul 13 2026
Fullerton, CA
Bid Date: Jun 30 2026
Fullerton, CA
Bid Date: Jul 01 2026
Fullerton, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
