Published August 13, 2026 at 8:00 PM

Updated August 19, 2026

Site work and new construction of a water / sewer project in Taloga, Oklahoma. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of 2-3 inch waterline extension along E. 800 County Road. Tie into existing waterlines from 2" to 3" pvc with fittings 8000 LF of 3" waterline (DR- 11 HDPE) and installation 3" gate valves x2 w/Box installed with fittings Sand backfill for 8000 LF after excavation and installation of waterline 2" PRV W/Bypass inside of 4'x4' steel can with wheel handled gate valves on both sides of the PRV PRV and all valves will be set according to engineering designs 10 AWG Tracer wire is to be installed and taped to the pipe at 10' intervals Trenchers are not to be used as this is not big enough for the pipe Trench line is to be dug with a mini excavator or backhoe Road crossings and lease road crossings will be restored to the same condition as they were prior to work being completed. After installation, waterline is to be sterilized and tested at the contractor's expense. After installation, waterline is to be pressure tested for 24 hours After successful pressure testing, waterline will be flushed for at least 1 hour or a chlorine test confirms the chlorine levels to match the chlorine levels in the already existing Red Star Rural Water line levels Contractor will follow all drawings and designs from Red Star Rural Water district engineer. If you have any questions regarding the bid specifications or the bid deadlines, etc., please contact Ashley Griffin at (580)-328-5446 or ashley.griffin@deweycounty.us. All bids must be in a sealed envelope, CLEARLY MARKED SEALED BID, BID NUMBER, BID DATE and BID OPENING TIME.

Bid Results

$154,955.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
15
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

September 7, 2026

Project location map

E. 800 County Road, Taloga, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.