Site work and new construction of a municipal facility in Delta, British Columbia. Completed plans call for the construction of a one-story above grade municipal facility; and for site work for a municipal facility.

The Work includes, but is not limited to, supply, delivery, installation, and provision of all labour, supervision, equipment, tools, materials, transportation, and incidentals necessary for the scope of work set out below, relating to the construction of an Operations Yard, including the construction of TFN’s Public Works Yard, establishment of a Temporary Archaeological Storage Area, and installation of a Water Filling Station. The Work generally includes, but is not limited to, the following major items: Public Works Yard The selected Proponent will: 1. Strip any topsoil and / or mixed vegetation per Geotechnical and Environmental requirements. 2. Fill and grade the site, including obtaining a Soil Permit per Geotechnical requirements and TFN’s Soil Transport, Deposit, and Removal Regulation. See Appendix H for Soil Permit Application Form. 3. Implement Erosion and Sediment Control Measures per Environmental requirements. 4. Install underground utilities per Contract drawings, including all testing and commissioning requirements. 5. Install shallow utilities and lighting. 6. Construct site access and parking areas including base gravels, Hot Hix Asphaltic Concrete (HMAC) Temporary Archaeological Storage Area The selected Proponent will: 1. Strip any topsoil and / or mixed vegetation per Geotechnical and Environmental requirements. 2. Fill and grade the site, including obtaining a Soil Permit per Geotechnical requirements and TFN’s Soil Transport, Deposit, and Removal Regulation. See Appendix H for Soil Permit Application Form. 3. Implement Erosion and Sediment Control Measures per Environmental requirements. 4. Install a 50 mm water connection per Contract drawings, including all testing and commissioning requirements. 5. Relocate of 50 mm sanitary forcemain per Contract drawings, including all testing and commissioning requirements. 7. Construct site access. Water Filling Station The selected Proponent will: 1. Construct a turn-around area including base gravels, Hot Hix Asphaltic Concrete (HMAC) and pavement markings 2. Install a 50 mm water connection per Contract drawings, including all testing and commissioning requirements. Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline 08/03/2026 Questions are to be submitted in writing quoting the RFP number and Kim Garma up to 3 business days before the submission deadline to purchasing@tsawwassenfirstnation.com

GC Bidding

$250,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
74
Bidding Soon
2,535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.