BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 25, 2026 at 8:00 PM

Updated July 30, 2026

Renovation of a mixed-use development in Tuscaloosa, Alabama. Working plans call for the renovation of a medical facility.

Renovation of the flooring system within the Dietetics Department, including replacement of the existing flooring with a Sherwin-Williams Poly-Crete SLB seamless cementitious urethane flooring system and installation of a 6-inch integral cove base. Work includes all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary to complete the project. The contractor shall conduct site verification, field measurements, project coordination, infection control planning, dust mitigation, and provide containment and negative air equipment throughout construction. The contractor shall disconnect, remove, relocate, reinstall, and reconnect kitchen equipment required for flooring installation, including commercial ovens, steam kettles, dishwashers, prep tables, refrigeration equipment, ice machines, food service carts, sinks, serving line equipment, and other identified kitchen equipment. The contractor shall protect equipment during relocation, verify proper operation following reinstallation, and repair or replace any equipment damaged during the process. Work includes removal of existing floor coatings as necessary, concrete substrate preparation, moisture testing, installation of the Poly-Crete SLB flooring system, quality control inspections, maintenance of safe and clean work areas, final punch-list corrections, and operational verification of all reinstalled equipment. Deliverables include the completed flooring system, integral cove base, fully operational kitchen equipment, warranty documentation, maintenance recommendations, product data sheets, and a final inspection report. Location: Tuscaloosa VA Medical Center, Building 143 Dietetics Department, 3701 Loop Road East, Tuscaloosa, AL 35404. The Method of Contractor Selection has not been determined at this Time.

Final Planning

$400,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
40
Bidding Soon
740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2026

September 24, 2026

Project location map

3701 Loop Rd, Tuscaloosa, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.