BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated July 30, 2026

Renovation of an educational facility in Dublin, Ohio. Completed plans call for the renovation of a educational facility.

Roof replacement at Coffman High School. SUMMARY OF WORK The following is only a summary of the work that is to be completed and is not all-inclusive. The Contract Documents shall be reviewed as they specify all of the requirements for the project. Base Bid - Roof Replacement - Roof Areas 11a, 11b, 11c, 11d , Q, and R Low-Sloped Roof System Replacement 1 . Remove existing membrane roof system down to the structural deck, where specified. The base flashings and some sealants on some roof areas have asbestos containing materials. The Contractor is responsible to comply with all applicable regulatory requirements in the removal, handling, and disposal of all asbestos containing materials. See Sections 00 31 23.23, 00 31 23.24, and 00 31 26.25 for copies of the Asbestos Sampling Reports for this project. The roof areas referenced in the asbestos testing reports correspond to the roof areas listed on the roof plans as follows: Roof Area FR2 => Roof Areas 11a - 11d Roof Area FR3 => Roof Areas F1a - F1b Roof Area FR4 = > Roof Areas H1a - H1d 2. Inspection of the structural steel deck for areas of deterioration.Areas of corroded steel roof decking shall be prepared and painted on a unit price basis. See Section 01 21 00 Allowances for the quantity of corrosion removal and painting that is to be included in Base Bid. Areas of moderately-to-severely corroded steel roof decking shall be replaced on a unit price basis. See Section 01 21 00 Allowances for the quantity of steel roof deck replacement that is to be included in Base Bid. Install new 60 mil fully-adhered Thermoplastic Membrane Roof System in accordance with the Contract Documents. Install new coping caps , edge metal , counterflashings, and miscellaneous sheet metal as specified Bidders requiring clarification or interpretation of the Bidding Documents shall submit a written request for information to the Architect at least seven (7) days prior to the date for receipt of Bids. By submitting its Bid, each Bidder represents and agrees, based upon its careful and diligent review of the Bidding Documents, that it is not aware of any conflicts, inconsistencies , errors or omissions in the Bidding Documents for which it has not timely notified the Architect. Question Deadline 08/13/2026

Sub-Bidding

$1,250,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
136
Bidding Soon
3,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 14, 2026

Project location map

6780 Coffman Rd, Dublin, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.