Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2026 at 8:00 PM

Updated September 9, 2026

This is a service / maintenance or supply contract in South Burlington, Vermont. Contact the soliciting agency for additional information.

As of September 03, 2026 no bids received. No definite date for the rebid. Excavation of roadway materials, replacement and installation of water system components including gate valves, valve boxes, 3-way gate valve assemblies, water line tees, curb stops, and water service lines. Includes backfill and restoration of excavation sites including curbing, concrete sidewalk, and bituminous pavement repair.

Final Planning

$500,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
173
Bidding Soon
2,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

March 3, 2027

Project location map

104 Landfill Road, South Burlington, VT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed