Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 3, 2026 at 8:00 PM
Updated August 8, 2026
Renovation of a military facility in Folsom, California. Completed plans call for the renovation of a military facility.
Amendment 4 extends the proposal due date and updates the acquisition milestone schedule for the California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project. The amendment revises the procurement schedule to provide additional time for proposal submission and adjusts related acquisition milestones accordingly. All offerors shall review the updated schedule and incorporate the revised dates into their proposal planning and submission activities. The project magnitude is estimated to be more than $80,000,000. Phase 2 Questions Due: 8/14/2026 @1700 MT PLACE OF PERFORMANCE: The below-listed work will be held at the following locations: Maxwell Capacitor Switching Station located at 4794 Standard Road, Maxwell, California 95955. Tracy Substation is located at 16800 W Kelso Road, Byron, CA 94514. Olinda Substation is located at: 18275 Gas Point Road Cottonwood , CA 96022. (Note that work shall occur at Tracy and Olinda Substations after Maxwell Switching Station as described in the project description). PROJECT DESCRIPTION WAPA is requesting a proposal to replace the 525-kV series capacitor banks at Maxwell, Tracy and Olinda substations. Replacement series capacitor banks shall have the same MVAR compensation level and dual segment design at each substation as the existing design. Specifically, the Contractor's Design-Build proposal shall include engineering design , manufacturing and/or procurement, construction, and commissioning of equipment by removing and replacing the existing series capacitor banks with new and in-kind series capacitor banks (no changes to series capacitor size, rating, segmentation , and line compensation level) and ancillary equipment such as but not limited to breakers, line and ground motor-operated disconnect switches and protection and control devices. The Contractor shall perform engineering design for full integration of new series capacitor banks into WAPA's existing substation ; as well as procure, install , test and commission all ancillary equipment. The Contractor shall provide a Project Manager who will act as the key focal point for technical , schedule and financial communication
GC Bidding
$80,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2026
May 31, 2027
Multiple Locations, Folsom, CA
Related To This Project
Folsom, CA
Bid Date: Aug 10 2026
Folsom, CA
--
Folsom, CA
--
Folsom, CA
Bid Date: Jul 24 2026
Folsom, CA
Bid Date: Jun 29 2026
Folsom, CA
--
Folsom, CA
Bid Date: Jul 06 2026
Folsom, CA
--
Folsom, CA
--
Folsom, CA
Bid Date: May 22 2026
Folsom, CA
Bid Date: May 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
