Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 27, 2026 at 8:00 PM
Updated August 1, 2026
Site work for a water / sewer project in Borger, Texas. Conceptual plans call for site work for a water / sewer project.
The area of Stephens Street receives deep surface flows with velocities with flows that have been enough to pick up vehicles and carry them down the roadway. The proposed project located at Stephens Street is a new storm drain line that outlets at the new Sterling Street culvert and runs approximately 1250 LF up Stephens Street and terminating just prior to North Cedar Street. In addition to the inlets that will be placed along Stephens Street, additional inlets are proposed to pick up flows from the side streets of Cooley Drive, Hazelwood Street, and Boyd Street. The downstream end of the system is proposed to be a 7'X3' RCB and reduces to a 24-inch RCP as you move upstream. A 6'X3' RCB would be proposed for approximately 90 LF south on Hazelwood for future extension of the Hazlewood Storm Drain Project and allowing the inlets to be placed on the southern end of the Stephens/Hazelwood intersection. For the purpose of cost estimates, it has been assumed that the pipes from the inlets to the mainlines are all 18-inch RCP for this study. The Master Drainage Plan identified this project as priority #10. The project is included in the city 2026 - 2030 Capital Improvement Program (CIP). As of July 27,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
$1,289,075.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2029
Stephens Dr, Borger, TX
Related To This Project
Borger, TX
--
Borger, TX
--
Borger, TX
--
Borger, TX
--
Borger, TX
Bid Date: May 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
