BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 6, 2026 at 8:00 PM

Updated August 24, 2026

Site work and renovation of an educational facility in Acton, California. Completed plans call for the renovation of a educational facility.

Educational facility bundle project including various facility improvements as part of the SEEDS program. Sites - Locations - Project No's/Bid/RFQ# 1 SUN VALLEY MAGNET SCHOOL - 7330 Bakman Ave., Sun Valley, CA 91352 - 10373481/2610142 2 MULHOLLAND MIDDLE SCHOOL - 17120 Vanowen St., Lake Balboa, CA 91406 - 10375632/2610143 3 NEWCASTLE ELEMENTARY SCHOOL - 6520 Newcastle Ave., Reseda, CA 91335 - 10375124/2610144 4 BURBANK ELEMENTARY SCHOOL - 12215 Albers St., North Hollywood, CA 91607 - 10373569/2610145 Bonds: $288,000 Other Bond. 1. SUN VALLEY MAGNET SCHOOL: a) Clear and grub grass and planting areas. b) Remove existing irrigation piping and equipment. c) Remove existing soil below adjacent paving elevation. d) Remove existing concrete curb. e) Remove and relocate existing bench as indicated in the plan. Patch and repair the area where the bench was removed from and match existing surface. f) Furnish and install new granitecrete paving. g) Furnish and install new concrete header. h) Furnish and install new planting area with new plants and with 3" thick wood mulch to be placed atop in all planting areas. i) Furnish and install new re-purposed log stools and log benches. j) Furnish and install new irrigation system. k) Install and plant shrubs as indicated in the plans. MULHOLLAND MIDDLE SCHOOL: a) Remove existing asphalt. b) Clear and grub existing planter strip. Excavate soil as needed to allow for installation of 3" deep wood mulch in this area. c) Furnish and install new granitecrete paving. d) Furnish and install new planting areas with new plants and with 3" thick wood mulch to be placed atop in all planting areas. e) Furnish and install new concrete curb. f) Furnish and install new re-purposed log stools and log benches. g) Furnish and install new tree root barriers. h) Furnish and install new irrigation system. NEWCASTLE ELEMENTARY SCHOOL: a) Remove existing asphalt as needed to install new landscape. b) Furnish and install new paint over all partially remaining game striping. c) New trench to irrigation point of connection. d) Furnish and install new concrete header. e) Furnish and install new granitecrete paving. f) Furnish and install new planting areas with new plants and with 3" deep mulch. g) Furnish and install new irrigation water point of connection in existing yard box. h) Furnish and install new garden storage box. i) Furnish and install new tree root barriers. j) Furnish and install new re-purposed log stools and log benches. k) Furnish and install new bottomless raised planter beds. 1) Furnish and install new cedar potting bench. m) Furnish and install new compost bin. n) Furnish and install crushed gravel paving. o) Furnish and install new irrigation system. BURBANK ELEMENTARY SCHOOL: a) Remove existing asphalt. b) Clear and grub existing tree well and remove any stump or roots. c) Remove existing planters. d) Remove existing game striping. e) Furnish and install new granitecrete paving. f) Furnish and install new planting area with new plants and with 3" deep shredded bark mulch to be placed atop in all planting areas. g) Repaint line-up dots to match existing adjacent line-up dots. h) Furnish and install new composite wood header. i) Furnish and install new asphalt paving at existing tree well. j) Furnish and install new 6" and 4" concrete curb. k) Furnish and install new boulders. CONTRACTOR to ensure that all boulders have generally a smooth surface. Relatively flat for seating. No sharp, jagged edges. Note: Supplier to provide representative images of selected project boulders for approval by LAUSD prior to shipping. Contractor to put boulders in pallets to make it easy to move around. 1) Furnish and install new re-purposed log stools and log benches. m) Furnish and install new stepping stones. n) Install tree trunk seating furnished by Owner. o) Furnish and install new linear root barrier at edges of all new planting. p) Furnish and install new irrigation system The District's Contract Bundle Bond Estimate is $1,172,000.00

GC Bidding

$1,172,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
649
Active Projects
268
Bidding Soon
4,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2026

October 19, 2026

Project location map

Multiple Locations, Acton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.