Published July 31, 2026 at 8:00 PM

Updated August 1, 2026

Site work and renovation of a water / sewer project in Knoxville, Tennessee. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000431789 Rebuilding of sequencing batch reactor wastewater plant components. Bonds: 5% Bid Bond, 100% Payment Bond, 100% Performance Bond. Question Acceptance Deadline 08/11/2026 04:00 PM EDT All questions about the meaning or intent of the Bidding Documents are to be submitted to the Owner in writing. Contractor to provide labor and incidentals necessary to complete the removal and replacement of two (2) jet aeration systems and associated submersible circulation pumps. New equipment for replacement is already currently onsite and owned by KUB. All electrical and SCADA work to be by KUB. Contractor to design and fabricate pump rails & brackets, per KUB approval. The Work shall be completed in strict accordance with the Contract Documents. Contractor will provide all labor, materials, equipment, and incidentals as required to restore the Site to a condition equal to or better than the Site condition which existed prior to initiation of the Work activities Remove existing SBR equipment in 2 basins and replace-in-kind per MTS shipping list provided a. Includes: i . Air & Liquid manifold sections 1,2, & 3 ii . Risers & return piping iii . Pipe support assemblies & liners iv. Pipe field wrapping v. Associated hardware & epoxy vi. Qty 2 liquid circulation pumps 1. All electrical & SCADA by KUB 2. Contractor to coordinate pumps/motor termination with KUB SMS b. Handling & installation per manufacturer's instructions (provided) c. Fiberglass "welding" of sections, aka "field wrapping" d. Approx. 90' total length Contractor to arrange startup activities with manufacturer representative onsite 3. Only one basin can be taken offline at a time a. Manufacturer startup need to occur on separate occasions b. KUB operations to monitor system for 21 days minimum prior to taking down second basin 4. Field modification of existing fiberglass tie-in, 1 per SBR basin 5. Field modifications of exiting stainless steel pump rails/brackets, 1 per basin a. Stainless 316L b. Minimum 3/8" thickness c. Contractor design to be KUB approved 6. Removal of existing concrete pump foundation, 1 per basin 7. KUB to drain & clean each basin prior to contractor entry. 8. KUB to provide containers & disposal

Sub-Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
62
Bidding Soon
928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 9, 2026

Project location map

To Be Determined, Knoxville, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.