BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 20, 2026

Site work and new construction of a municipal facility in West Milton, Ohio. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Construction of two customized masonry structures for displaying corporation entrance signage, including provision of all necessary materials and labor. Information: Ben Herron - Service Director 937-698-1500 #116 or herron@westmiltonohio.gov Sealed bids for furnishing all labor, equipment, and supplies for the construction of two structures; one located at the intersection of St. Rt. 571 and Iddings Road on the northwest corner, and one located at 2334 S. Miami Street, and both locations are inside the Village of West Milton, OH 45383. The contractor shall install the masonry structures in accordance with these bid documents, including the instructions to bidders, general conditions, specifications, bid proposal and contract and all applicable local, state, or federal regulations and laws. The bid shall include all costs associated with providing project completion . The details of this project are as follows: Structure #1 - E. Tipp Pike (St Rt 571) at Iddings Road - Northwest corner in village right of way, front facing east. Site to be marked by village staff. A pre-construction site visit will be required by the awarded contractor and village staff prior to the start of construction. A. Ten-foot total width by eight-foot total height. B. Six-foot open center sign areas. C. Two-foot square pillars. D. Footer blocks must be gray "Split Faced" with textured side facing outward with a four block minimum footer depending on sub-soil and site grade. E. Rebar reinforcement. F. Rounded limestone caps. G. Vertical brick on top pillar row. H. Village to provide custom aluminum signage. I. Village provides "post construction" reclamation and landscaping. Structure #2 - 2334 S. Miami St (Str Rt 48) in the village right of way, front facing south. Site to marked by village staff. A pre-construction site visit will be required by the awarded contractor and the village staff prior to the start of construction. A. Seven-foot total width by five-foot total height. B. Four-foot open center sign areas. C. One and One Half foot square pillars. D. Footer blocks must be gray "Split Faced" with textured side facing outward with a four block minimum footer depending on sub-soil and site grade. E. Rebar reinforcement. F. Rounded limestone caps. G. Vertical brick on top pillar row. H. Village to provide custom aluminum signage. I. Village provides "post construction" reclamation and landscaping.

Bid Results

$34,058.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
128
Bidding Soon
1,949
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

October 12, 2026

Project location map

Multiple Locations, West Milton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.