BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 3, 2026

Site work for a bridge / tunnel in Lake Jackson, Texas. Completed plans call for site work for a bridge / tunnel.

Work is described in general, non-inclusive terms as: 1. FOREST OAKS LANE work includes: (a) Removal of existing waterline, concrete pavement, 3-42" RCP culverts, sidewalks, pedestrian handrail, and two (2) headwalls. (b) Installation of waterline offset, concrete pavement, sidewalks, 2-4'x4' RCB culverts, pedestrian handrail, a concrete slab, and two (2) headwalls. 2. DIXIE ROAD work includes: (a) Removal of concrete pavement, 3-48" RCP culverts, sidewalk, pedestrian handrail, and concrete slope paving. (b) Installation of waterline offset, concrete pavement, sidewalk, 2-5'x5' RCB culverts, pedestrian handrail, a concrete slab, and two (2) headwalls. 3. PINE DITCH work includes: (a) Regrade and armor Pine Ditch with concrete slope paving. Bonds: 5% Bid Bond, Certified Check required. Question Deadline 08/05/2026 at 2:00 PM CT Questions are to be submitted using the question and answer process on online. A response will be posted for questions submitted until 12:00 p.m. on Friday, August 14, 2026. A response to a question posted on online.

GC Bidding

$1,200,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
160
Bidding Soon
3,122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

October 3, 2026

Project location map

Multiple Locations, Lake Jackson, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.