Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 22, 2026

Site work and paving for a civil project in Cape Coral, Florida. Working plans call for site work for a water / sewer project; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of October 15, 2026 - The City of Cape Coral is rejecting all bids for Invitation to Bid number 2026-ITB-CP030-JM, per City Ordinance Article VII, Section 2-144. The City reserves the right to revise the specifications and reissue the ITB at a later date. The City of Cape Coral, Florida will receive Sealed Bids for Invitation to Bid # 2026-ITB-030-JM, North 3 Utilities Extension Project (UEP) Contract 2 - Area 901 & 904 in accordance with the specifications on file. The Work is comprised of the construction of potable water mains, irrigation water mains, sewer force mains, gravity sewer mains, sewer lift stations, storm drain and pipe replacements, restoration, road reconstruction, landscaping, roundabout, bridge modifications, canal crossings, stormwater pond, and other Work displayed or described in the Contract Documents. Question Deadline 08/10/2026 at 2:00 PM ET N No questions will be accepted after deadline and all questions must be submitted through electronically. The City reserves the right to reject any or all bids, award in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. Bidder agrees to achieve Substantial Completion of all utility Work, as defined in Section 01700, within 540 calendar days of Notice to Proceed, as provided in Paragraph 4.01 of the General Conditions (Section 00700). This timeframe includes all Direct Purchase Orders (DPO). Bidder agrees to achieve Final Completion of all Utility Work, as defined in Section 01700, within 660 calendar days of Notice to Proceed. No work is to begin prior to the issuance of a fully executed Purchase Order (PO) and a Notice to Proceed (NTP). Bidder agrees that e Work will be completed and ready for final payment, including Final Asphalt Work, as defined in Section 01700 and in accordance with paragraph 15.06 of the General Conditions, Section 00700, within 720 calendar days of notice to Proceed. It is required that the respondent hold a valid General Contractor's license through the State of Florida to perform the work and have a local competency license and also be registered in the City of Cape Coral. Respondent will attach copies of the documents as proof of qualifications.

Final Planning

$48,071,239.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
70
Bidding Soon
1,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

October 26, 2026

Project location map

Multiple Locations, Cape Coral, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed