Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 18, 2026 at 8:00 PM
Updated September 24, 2026
Renovation of a military facility in Goulds, Florida. Completed plans call for the renovation of a military facility.
Set-asides: 100% SBE. Question Deadline 08/12/2026 at 6:00 PM ET All Questions are due at 5:00 PM CST at Brittany Linthicome by email at brittany.linthicome@us.af.mil Scope of Work The contractor shall provide all labor, materials, and equipment necessary to perform the following tasks: 2.1 Main Electrical Panel Replacement Demolish and remove the existing main electrical panel. _ Install a new main electrical panel with all new circuit breakers. _ Seal all wall penetrations to ensure a watertight seal around conduits. 2.2 Exterior Receptacle Replacement _Replace twelve (12) existing exterior wall receptacles with new 20-amp rated devices. Connect the new receptacles to a new Ground Fault Circuit Interrupter (GFCI) breaker in the main panel. Remove any existing extension boxes on the exterior receptacles. Install new receptacles and in-use (bubble) covers for all exterior receptacles. 2.3 Sub-Panel Breaker Refresh _ Install fifteen (15) new circuit breakers in the existing load center sub-panel to refresh the panel's integrity. 2.4 Exterior Lighting Replacement _ Remove and dispose of six (6) existing exterior safety wall lights and their associated wood mounting plates. Install six (6) new LED wall pack lights. Mount and seal the new light fixtures to the building to ensure a watertight installation Performance Requirements _ All work shall be performed in a professional manner and in accordance with all applicable national, state, and local codes and regulations. All materials and equipment shall be new and of a quality that meets or exceeds industry standards. _ The contractor shall be responsible for all necessary permits and inspections. The work area shall be kept clean and free of debris at all times.
Award
$4,000,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2026
November 2, 2026
101 West E Avenue, Goulds, FL
Related To This Project
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
--
Goulds, FL
Bid Date: Jul 12 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed