BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated July 31, 2026

Site work, paving and new construction of a water / sewer project in Christiansburg, Virginia. Completed plans call for the construction of a water / sewer project.

Construction of a new prefabricated concrete building housing a new boiler/heat exchanger unit with digester gas piping, sludge piping, lighting, HVAC, site civil work including paving, grading, buried piping installation, electrical, process instrumentation, SCADA integration, and piping and valve modifications. Bonds: Bid Bond required (unspecified amount). Questions must be received by August 18, 2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing A mailed Bid shall be addressed to Kim Widrig, Purchasing Coordinator, Town of Christiansburg, 100 East Main Street, Christiansburg, VA 24073. The Work consists of equipment, materials, and labor associated with a new Heat Exchanger and Boiler Building with new heat exchanger/boiler, sludge piping, digester gas piping, electrical, controls, and SCADA integration. Work shall include all electrical, controls, SCADA integration, mechanical, floor drain plumbing, and structural work to complete a functional and complete system in accordance with drawings and specifications. 1 . Contract includes: A new precast concrete building with cast-in-place foundation. Overhead door, man doors, heating, ventilation, and lighting. Electrical including trenching and new power feed to the new building and distribution panelboard for lighting, HVAC, and boiler control panel. HVAC including exhaust fan, louver, unit heater. Plumbing including floor drain. Installation of new heat exchanger/boiler unit with ancillary instrumentation including manometer, pressure sensor and indicating transmitter, thermal mass flow meter, and gas detection safety sensors and panel. SCADA integration of heat exchanger/boiler alarms and monitored sensors and flow meters. Modification of existing sludge and digester gas piping in the existing Digester Building. Demolition of existing heat exchanger/boiler and appurtenances. Repair of abandoned openings and penetrations in existing Digester Building. Bid Alternate: Demolition of existing electrical conduit, wiring, and connections to the existing heat exchanger/boiler in the existing Electrical Room of the existing Digester Building

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
56
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 26, 2026

Project location map

2557 Crab Creek Rd, Christiansburg, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.