Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 15, 2026

Site work and new construction of a bridge / tunnel in Madison, Ohio. Completed plans call for the construction of a bridge / tunnel.

Bridge replacement project involving excavation, structural work, and utility/drainage coordination associated with bridge infrastructure. Bonds: 100% Bid Bond, Certified Check required, 100% Performance Bond. Set-asides: 9% SBE. Question Deadline 08/27/2026 Every request for such interpretation should be in writing addressed to Chuck Duvall, Madison County Engineer's Office, 825 US 42 NE, London, Ohio, 43140

Award

$685,551.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
104
Bidding Soon
1,868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

October 15, 2026

Project location map

Lewis St, Madison, OH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed