Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 8, 2026

Site work for a playground / park / athletic field in Akron, Ohio. Conceptual plans call for site work for a playground / park / athletic field.

Summit Metro Parks ("Metro Parks") is seeking qualified consulting firms to perform engineering and design services for the Silver Creek Trail project. The general scope includes route selection, design, construction document preparation and permitting for a multi-purpose trail that will extend from Trolley Line Park in Wadsworth, pass Silver Creek Metro Park, to the Towpath Trail in Barberton. The method of Contractor Selection has not been Determined at this time. Requests for proposals for design services is underway.

Conceptual

$175,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
135
Bidding Soon
2,416
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2027

Project location map

Multiple Locations, Akron, OH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed