BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 20, 2026

Demolition, site work, paving, new construction and renovation of a mixed-use development in Marshall, Texas. Completed plans call for the renovation of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and for paving for a educational facility.

The Owner plans to replace the existing parking lots at the Athletic Field House and along Five Notch Drive and replace the existing canopy on the Five Notch side of the High School . The Project may include the following general scope items: 1. Demolition 2. Site Utilities 3. Concrete 4. Striping 5. Aluminum Canopy System 6. Electrical Demolition, site utilities, concrete work, pavement striping, installation of an aluminum canopy system, and electrical upgrades.

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
67
Bidding Soon
669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

October 1, 2026

Project location map

1900 Maverick Dr, Marshall, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.