Published September 3, 2026 at 8:00 PM
Updated September 16, 2026
Site work for a military facility in Montgomery, Alabama. Completed plans call for site work for a military facility.
Assess and safely remove the Blue Thunder Rappel Tower at the OTS Blue Thunder training ground, including removal of subsurface supports, proper disposal of all demolition debris, and restoration of the site upon completion. Provide all personnel, equipment, fuel, tools, materials, transportation, supervision, and any other resources necessary to perform the demolition professionally and safely. Review the Draft Statement of Work for detailed requirements and the Request for Quote for quote submission instructions and required supporting documentation. Demolition and Removal of 60-Foot Rappel Tower Location: Blue Thunder Training Site, Maxwell AFB Objective: Safely dismantle, remove, and dispose of the existing 60-foot wooden rappel tower, including all associated hardware, guy wires, and structural supports, and restore the site to its pre-demolition condition without disrupting ongoing training operations. o General Requirements and Site Preparation The Contractor shall provide all labor, equipment, materials, and supervision required to safely demolish the structure. Due to active personnel training in the Blue Thunder area, the Contractor must coordinate a daily work schedule with the Site Manager. High-visibility barricades and exclusion zones must be established daily and removed or secured at the end of each shift. A daily Foreign Object Debris (FOD) and hazard sweep must be conducted to ensure the safety of training personnel. o Structural Demolition and Guy Wire Removal The Contractor shall systematically dismantle the 60-foot wooden tower structure. This includes the removal of the central wooden stair access, decking, railing, and main vertical supports. The Contractor shall disconnect, dismantle, and completely remove all guy wires, including their respective ground anchors. All dismantling must be done in a controlled manner (e.g., using a crane or manlift) to prevent uncontrolled collapse into the active training area. o Sub-Surface Support Removal To prevent future hazards, all main wooden supports and structural footings must be excavated and completely removed to a minimum depth of 4 inches below the final grade. Any concrete or aggregate footings associated with the supports or guy wire anchors must also be extracted and removed from the site. o Debris Disposal All demolished materials, including treated wood, metal fasteners, guy wires, and concrete footings, shall be hauled off Maxwell AFB property. The Contractor is responsible for the legal disposal of all materials at an approved Construction and Demolition (C&D) landfill . Treated wood must be handled and disposed of according to local environmental regulations.
Post-Bid
$3,000,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2026
October 12, 2026
1564 Maxwell Blvd, Montgomery, AL
Related To This Project
Montgomery, AL
Bid Date: Sep 15 2026
Montgomery, AL
Bid Date: Sep 03 2026
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
Bid Date: Sep 21 2026
Montgomery, AL
Bid Date: Aug 26 2026
Montgomery, AL
Bid Date: Aug 18 2026
Montgomery, AL
--
Montgomery, AL
Bid Date: Aug 17 2026
Montgomery, AL
Bid Date: Jul 21 2026
Montgomery, AL
Bid Date: Aug 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.