BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 24, 2026

Site work and renovation of a water / sewer project in Sault Ste. Marie, Ontario. Completed plans call for the renovation of a water / sewer project.

Foundation wall dampproofing, rigid insulation installation, parapet flashing cap repairs, and construction of a new 2.4 m high steel chain-link security fence and swing gate, including excavation, aggregate reinstatement, grading, and site restoration. The work generally consists of foundation wall dampproofing, installation of rigid insulation, parapet flashing repairs, construction of a new 2.4 m (8 ft) high galvanized steel chain-link security fence approximately 18 m (59 ft) in length, complete with one (1) 1200 mm swing gate, and associated site restoration. The work area is located primarily on the north side of the facility and will require excavation adjacent to the structure, removal and replacement of aggregate surfacing, localized grading adjustments, and restoration of disturbed areas. Question Deadline 08/11/2026 at 3:00 PM ET For the purposes of this procurement process, the "RFQ Contact" will be: Marc DeAmorim, Procurement Manager PUC Services Inc. (on behalf of PUC Distribution Inc.) 500 Second Line East Sault Ste. Marie, ON P6A 6P2 Email: purchasing.dept@ssmpuc.com Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

September 7, 2026

Project location map

4867 Second Line West Sault, Sault Ste. Marie, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.