BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated August 23, 2026

Renovation of a residential development in Great Barrington, Massachusetts. Completed plans call for the renovation of a residential development.

Project VUI-Unit 6 Flag Rock-Renovation. Rehabilitation of a two-story living unit, including partial new sheetrock, new doors, new flooring, new interior trim painting. Spot framing repair, new egress windows. Minor exterior scope, including gutter and woodwork repair. MEP upgrades, including new plumbing fixtures, electrical wiring and fixtures, exhaust fans, water heater, heating fixtures and window mounted air-source heat pumps. Alternates include power washing exterior of building and installation of new exterior doors and storm doors. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category 23.00.00 HVAC; 26.00.00 ELECTRICAL WORK The work is estimated to cost $ 250,180.00, including the cost of all alternates. 8.3% MBE and 8.2% WBE Question Deadline 08/07/2026 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven (7) calendar days before the date for receipt of the bids. Completion-60 consecutive calendar days. ALTERNATES - A. This Section lists the Alternates which appear in the Contract Documents. Consult the individual sections of the detailed requirements of each Alternate. B. Bid prices for each Alternate shall include overhead, profit, and all other expenses incidental to the Work under each Alternate. C. The Contractor and Subcontractors shall be responsible for examining the scope of each Alternate generally defined herein and for recognizing modifications to the Work caused by the Alternates and including the cost thereof in the bid price. D. The Contractor's alternate amount shall include the net change in cost to perform all of the work described in the Alternate. ALTNERATE NO. 1 A. Provide a sum to modify the contract price to add gently power washing painted vinyl siding at units #5 and #6 (entire building) to remove grime and algae build -up. Take care to not damage siding or other exterior surfaces through use of excessive water pressure.

Bid Results

$129,550.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
627
Active Projects
262
Bidding Soon
3,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

September 14, 2026

Project location map

2 Bernard Gibbons Dr, Great Barrington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.