Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2026 at 8:00 PM

Updated September 22, 2026

Demolition, site work, new construction and renovation of a manufacturing facility in Grand Forks, North Dakota. Completed plans call for the demolition of a manufacturing facility; for the renovation of a manufacturing facility; for the construction of a manufacturing facility; and for site work for a manufacturing facility.

Demolition of existing wheat conveyors, milling equipment, and related systems; construction of structural steel, concrete, rebar, grout, wall/floor/roof flashing, and sealing; installation of various milling equipment, filters, blowers, pneumatic conveying systems, piping, spouting, and ductwork. Bonds: 5% Bid Bond.

Post-Bid

$3,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
12
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 26, 2026

Project location map

1823 Mill Rd, Grand Forks, ND

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed