BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated September 1, 2026

Demolition, site work, paving and new construction of a mixed-use development in Marietta, Georgia. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Canopy Group 2 - Cheatham Hill ES, East Side ES, Palmer MS This project includes canopy work at three Cobb County School District locations, as outlined below: Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide. Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide. Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80 in length by 10 wide. - Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies please refer to the drawings. Scope of Work: - Install New Canopy System Extending From the Rear Canopy Along the Remaining Drive Aisle on the Side of the Building: 2 Heights. Remove and Replace Concrete Paving, Curb and Ramp at Canopy Extension. - Remove and Replace Concrete Paving at Front Entry, Approximately 2,200 Sf. - Remove and Replace the Existing Flag Pole at the Front Entry. PN - 26059 Project Number -S6K498CHHE, S6K501EASE, S6K215PALM

GC Bidding

$1,077,175.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
144
Bidding Soon
2,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

September 28, 2026

Project location map

Multiple Locations, Marietta, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.