BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 3, 2026

Site work and renovation of a multi-residential development in Miami, Florida. Completed plans call for the renovation of a multi-residential development.

Scope includes roof replacement with shingle installation, fascia and soffit repairs, exterior door replacement, window replacement with impact resistant glass, and exterior surface painting including walls, soffits, and trim. Contractor must obtain and submit all permits prior to performing any work). Chavely Ruiz Hernandez 721 SW 97 Court Cir. Miami FL, 33179 305-380-0002 786-484-5038 Exterior Repairs: 1) Re-Roof Complete: Pitched Deck Roofing General Specification All repairs and/or installations of new roof system shall comply with requirements of the MiamiDade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drips shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters, and all eves drip shall be backed with pressure treated 1X2 furring strips. NOTE #1 Include in your price the 1st 100 sf for replacement of any damaged or deteriorated sheathing or Framing members. NOTE #2 Roof ventilation as per FBC R806.1 , R806.2. Replace existing soffit vents with new ones. Ventilation openings shall have a least dimension of 1/16 inch (1.6 mm ) minimum and 1 /4-inch (6.4 mm ) maximum. Ventilation openings having at least dimensions larger Then 1/4 inch (6.4 mm ) shall be provided with corrosion-resistant wire cloth screening, hardware cloth, perforated vinyl or similar material with openings having a least dimension of 1/16 inch ( 1.6 mm ) minimum and 1/4-inch (6.4 mm) maximum. NOTE #3 Contractors are responsible for providing all necessary protection from the weather during a phases of roofing operation.

GC Bidding

$35,800.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
86
Bidding Soon
1,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

September 15, 2026

Project location map

721 SW 97th Ave, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.