Site work and renovation of a road / highway in South Gate, California. Completed plans call for the renovation of a road / highway.

Installation of retroflective back plates on signal heads, replacement of signal heads, implementation of Leading Pedestrian Intervals (LPI), installation of high visibility crosswalks and advance limit lines, and extension of raised median. Anticipated Award Date: October 12, 2026Questions will be accepted until Wednesday, August 19, 2026, at 4:00 p.m. Any questions submitted after August 20, 2026, will not be answered. Answers to questions will be issued and posted online in the planet bid portal. Bidders are required to post their questions to the City Project Manager online The purpose of the South Gate Citywide Intersection Improvement Project is to enhance pedestrian and motorist safety at seven major intersections. The desired improvements include but are not limited to upgrading signal hardware such as installing retroflective back plates on existing signal heads and the removal/replacement of existing signal heads with new signal heads at various intersections. The project will also accommodate pedestrians by increasing Leading Pedestrian Intervals (LPI) at 3 intersections along Firestone Blvd, and also install high visibility crosswalks with advance limit line at Firestone Blvd and Garfield Ave. The project will also extend the raised median at Southern P1 and Atlantic Ave to the south to prevent eastbound left turns. The following is a detailed description of the work required at each intersection: back-plates with retroreflective borders. Provide protected left turn phase for existing left turn lane. 2. Firestone Boulevard at Alexander Avenue - Improve signal hardware: lenses, back-plates with retroreflective borders. Provide protected left turn phase for existing left turn lane. 3. Firestone Boulevard at Santa Fe Avenue - Improve signal hardware: lenses, back-plates with retroreflective borders. 4. Garfield Avenue at Garfield Place Improve signal hardware: lenses, back-plates with retroreflective borders. Provide protected left turn phase for existing left turn lane. 5. Firestone Boulevard at Garfield Avenue - Improve signal hardware: lenses, back-plates with retroreflective borders. Modify signal phasing to implement a Leading Pedestrian Interval (LPI). 6. Firestone Boulevard at San Juan Avenue - Improve signal hardware: lenses, back-plates with retroreflective borders. Modify signal phasing to implement a Leading Pedestrian Interval (LPI). 7. Atlantic Avenue at Southern Place - Create directional median opening to restrict eastbound left turns.

GC Bidding

$949,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
644
Active Projects
272
Bidding Soon
3,854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

September 28, 2026

Project location map

Multiple Locations, South Gate, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.