BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 8, 2026

Site work for a civil project in Saint-Pie-de-Guire, Quebec. Completed plans call for site work for a water / sewer project.

Number: 2026-02 Reference number: 20161779 Deadline for receipt of complaints 2026-08-17 There is provision for a tendering process for each tender No Expected duration of the contract without options (in months) 4 The work mainly includes, but is not limited to: Dismantling and disposal of the following equipment: the upper section of the P-2 well head process mechanics within the existing valve chamber of well P-1 of a section of the existing discharge pipe from well P-1 certain existing electrical conduits Excavation and backfilling work required, including foundations and compaction of granular materials, shoring of trenches, water control (including pumping if required) for the implementation of the following structures: Assistance with the installation of the new P-2 wellhead (by process); Supply and installation of a reinforced concrete valve chamber, including drainage shaft, trap door, and access ladder; Supply and installation of new 75 mm Ø raw water discharge pipes made of DR-18 PVC for connection with P-2 and the connections to the existing pipe (PVC Cl. 160), including the connections to the projected mechanical joints (by process), the exploratory excavations to validate the depths of the existing pipes Assistance for the installation of the electrical conduits of the connection planned by the electrician; Supply and installation of 100 mm of HI-60 type insulation over the discharge pipes; Supply and installation of a bituminous coating and 50 mm of HI-60 insulation on the external walls of the PP. Supply and installation of a new wellhead, including pumping system, control panel, and accessories; Supply and installation of stainless steel piping, including fittings, Victaulic seals, accessories, and others related equipment Supply and installation of coated stainless steel sleeves for the wall rails in the new valve chamber; Supply and installation of the valves, air purge, and instrumentation in the new valve chamber, including the pressure control valve; Supply and installation of pressure sensors in the new valve chamber; Electrical work for the connection of new equipment; Programming and integration work in the existing control panel; The identification of the piping, valves, and other accessories; Testing, cleaning, disinfection, start-up, training and adjustments of equipment if required; Surveys, sampling, and analysis of soils in place to validate their composition and the appropriate layout sites The loading, transport, and disposal of surplus excavation and/or waste Repair and restoration of the site, including hydraulic seeding.

GC Bidding

$1,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
746
Active Projects
270
Bidding Soon
4,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2026

September 1, 2026

Project location map

To Be Determined, Saint-Pie-de-Guire, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.