BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 2, 2026

This is a service / maintenance or supply contract in Collinsville, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0 The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 21, 2026, at 1:30 PM at the Region Five/District Eight Office in Collinsville. Phase I/II surveying services are required for various projects and assignments, in District Eight. The Consultant's work is anticipated to consist of, though is not limited to, the following: Surveying services for Land Acquisition's Plats & Plans Unit, in District Eight. This work may include surveying to reference the highway centerline to public land lines, surveying to locate boundaries, record research, preparation and recording of monument records, preparation of legal descriptions, and preparation of Freeway Orders. This work may also include preparation of various plats and maps including Plat of Highways, existing right of way survey plats or maps, centerline plats, section corner plats, excess right of way plats and corridor protection maps. This work may also include right of way staking and designing proposed right of way for acquisition purposes. The work performed shall comply with the department's Land Acquisition Manual and with District Eight’s standards, guidelines and procedures. Surveying services for Studies & Plans’ Survey Unit, in District Eight. This work may include performing hydraulic surveys, topographic surveys, and horizontal and vertical control surveys for highway design projects in District Eight. The work performed must comply with the department’s and District’s standards and guidelines. The Consultant shall utilize the department’s SMD (point codes) file while conducting these surveys for the department. Surveying services to preserve and restore land survey monuments removed or disturbed during construction projects. This work may include pre-construction efforts to locate, inventory, and preserve all land survey monuments (such as section corners, property corners, right of way corners, centerline points, and other historical survey monuments as encountered) that may be disturbed or removed by construction activities, of various highway construction projects. This work may also include post-construction efforts to reset, restore and document all land survey monuments which were disturbed or removed during the construction activities of various highway projects. This work may also include preparing and recording monument records for all section corners within the construction limits of a proposed highway construction project. This work may also include preparation of plats, maps or exhibits identifying the land survey monuments found and reset Surveying services to provide technical support to assist District Eight’s Plats & Plans Unit and/or Survey Unit. This work may include providing various field and office technical support services, such as performing various miscellaneous survey projects and tasks, scanning and archiving records, and GIS development and support. This may also include work as a District Eight - Survey Project Manager, which could consist of the management and review of consultant prepared projects or other in-house efforts for the Plats and Plans Unit or Survey Unit, in District Eight. Some technical support services may be required to be performed at the District Eight office. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 037 - RFQ - Various Phase I/II Survey Projects, Various Routes

Conceptual

$1,000,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
113
Bidding Soon
1,400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2027

Project location map

Multiple Locations, Collinsville, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.