BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 3, 2026

This is a service / maintenance or supply contract in Long Grove, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 22, 2026, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for subject improvement. The improvement consists of roadway reconstruction and widening of IL 22. South Krueger Road shall be reconstructed and realigned to a common four-legged signalized intersection with Corporate Drive and IL Route 22. Old McHenry Road shall be reconstructed along with a replacement traffic signal. North Kruger Road shall be reconstructed, and Blackhawk Lane shall be realigned to form a four-legged new signalized intersection with IL 22 including a new traffic signal. The improvement includes Shared-Use Path, 17 Retaining Walls, seven major culvert crossings, a closed drainage system, Controlled Stiffness Column Ground Improvement and temporary retaining walls. Traffic will be managed with staged construction. One lane in each direction will be maintained throughout stage construction. Four main construction stages are anticipated to carry out the proposed work. The following structures may be included in this project: o New Culverts: 049-0603, 049-0604, 049-0605, 049-0606, 049-0607, 049-0608, 049-060X o New Retaining Walls: 049-W049, 049-W051, 049-W052, 049-W053, 049-W054, 049-W055, 049-W056, 049-W057, 049-W058, 049-W059, 049-W062, 049-W063, 049-W064, 049- W065, 049-W066, 049-W06 Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 11 - RFQ - IL 22 (Quentin to IL 83), Phase III Project

Conceptual

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
284
Bidding Soon
4,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2027

Project location map

IL-22, Long Grove, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.