BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 7, 2026

Site work for a mixed-use development in Danbury, Connecticut. Completed plans call for site work for a detention facility; and water / sewer project.

The contractor will provide all necessary labor, materials, equipment, tools, and incidentals necessary to demolish the existing failed warehouse ramp and construct a new ADA-compliant, heavy-duty concrete access ramp at the Federal Correctional Institution (FCI) Danbury Warehouse. The work includes full removal of deteriorated concrete and subgrade, excavation to required depths, installation of reinforced concrete footings, retaining walls, drainage systems, and placement of a new 48-foot sloped ramp designed to support continuous forklift traffic. The estimated magnitude of the project is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/21/2026 at 11:00 AM ET questions relating to the solicitation after the closing of the pre- quotation conference/site visit shall be ssent in WORD FORMAT to Luke Bonner, Contracting Officer, via email at lbonner@bop.gov

GC Bidding

$100,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,117
Active Projects
431
Bidding Soon
7,687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2026

September 30, 2026

Project location map

33 1/2 Pembroke Rd, Danbury, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.