Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2026 at 8:00 PM

Updated September 10, 2026

Demolition, site work, environmental remediation and renovation of a detention facility in Moose Lake, Minnesota. Completed plans call for the renovation of a detention facility; for the demolition of a detention facility; for environmental remediation for a detention facility; detention facility; detention facility; and detention facility.

Replacement of existing glazing and sealants in detention-grade windows with new detention-grade glazing and compatible assemblies, executed in multiple phases. Bonds: 5% Bid Bond, Payment Bond required (unspecified amount), Performance Bond required (unspecified amount). Question Deadline 08/27/2026 at 2:00 PM CT Soliciting Agent: Craig Fernholz craig.fernholz@state.mn.us The work will be done under one prime contract that includes: General, Demolition and Remediation construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. The project scope includes the replacement of existing glazing and sealants in detention-grade windows. 2. All new glazing shall meet detention-grade requirements and be compatible with the existing window assemblies. 3. To accommodate operational requirements and maintain facility occupancy during construction, the work will be executed in multiple phases

Post-Bid

$271,739.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
28
Bidding Soon
447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

October 5, 2026

Project location map

1111 MN-73, Moose Lake, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed