Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2026 at 8:00 PM

Updated September 21, 2026

Site work and renovation of an educational facility in Athens, Michigan. Completed plans call for the renovation of a 2,874-square-foot educational facility.

Boiler room improvements including system modifications and equipment installation. The scope of work is to include but not be limited to the following: 1 . Obtain all required electrical construction permits and inspections. 2. Provide a 120/208 volt, 3 phase, 4 wire, distribution system for lighting, convenience receptacles, small appliances and small motors. 3. 4. 5. 6. 7. 8. 1.4 A. 1. Refer to mechanical drawings, security, communications and access control drawings. Provide low voltage raceways (1/2" minimum ) for all thermostats, controls and low voltage systems. No low voltage wiring of any type shall be visible in exposed ceiling areas. Provide complete electrical installation including all components, i.e. light fixtures, lamps, receptacles, conduit, wire, etc. Provide for Owner training by factory representatives in operation and maintenance of systems where specified. Overcurrent protective devices installed into existing equipment shall meet or exceed the rating of that equipment. Series ratings will not be accepted. Provide selective demolition of electrical systems and equipment as indicated on the drawings. Submit documentation such as shop drawings, record documents, maintenance manuals, infrared scan results, systems test results, fire alarm system certification , etc. as specifie

Post-Bid

$500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

October 12, 2026

Project location map

599 E Williams St, Athens, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed